Lenex joined forces with Barton Malow on the largest building project in Notre Dame’s history—the $400 million Campus Crossroads Construction Project. This South End Zone expansion added three academic and student life buildings connected to Notre Dame Stadium. Lenex supplied the steel for this 7.5-story multi-use structure, which serves as a student hub, the main entrance to the football stadium, and the support for a massive 5,200-square-foot scoreboard.